The top reported proficiency rate is 79% in Math. The lowest is 59% in English language arts.
Original Research by School Decision on Cambridge Junior-senior High School
Cambridge Junior-Senior High School sits on South Park Street, a short walk from the center of Cambridge village in southern Washington County. The school shares a campus with the district's elementary grades, making Cambridge Central School District a single-site, K-12 community hub in the way that is common to small rural districts in upstate New York.
The school serves grades seven through twelve, and its enrollment is modest in size for that grade span. A substantial share of students qualify for free or reduced-price lunch, reflecting the rural economic character of the area. The student body is predominantly white, with smaller proportions of Hispanic, Black, and other students. Data on English learners and students with IEPs was not available in the information reviewed.
State assessment results are reported for grades seven and eight, which are the tested grades in this building. In math, seventh graders performed solidly, with more than three in five reaching proficiency, and eighth graders performed particularly well, with nearly all tested students reaching proficiency. In ELA, both seventh and eighth graders landed in the range of roughly three in five students reaching proficiency, a more middling result by New York standards. Eighth-grade science proficiency came in near two-thirds of tested students. Participation rates were generally strong in ELA and seventh-grade math, though the eighth-grade math participation rate was notably lower and a parent may want to ask the school directly about what accounts for that gap. No multi-year trend data was available, so it is not possible to say whether these results represent improvement or decline.
Placed against other districts in Washington County, the school's overall proficiency index across tested subjects and grades falls in the top quartile of the comparison set. That is a meaningful position for a small rural school serving a community with real economic pressures.
Graduation rate data was not reported for this entity in the information provided. Chronic absenteeism data was similarly absent.
Program information was not included in the data reviewed. A parent interested in AP offerings, career and technical education, dual enrollment, or extracurricular depth would need to check directly with the school or the district's website.
The district has been through a public identity shift recently. After a prolonged legal battle, the board voted unanimously in April 2024 to adopt the Tigers as the school's mascot, replacing the Indians name that the state had mandated be retired. The colors stayed the same; the dispute is resolved. Separately, voters approved a capital project in late 2023 that includes a new auditorium, with construction slated for summer 2025 and no additional tax impact on residents.
The more pressing near-term issue is fiscal. For 2026-27, the district proposed a budget that exceeded its tax cap by a wide margin, driven by staff salaries and declining state aid. Voters rejected it in May 2026, making Cambridge the only Washington County district to fail its budget that cycle. The board subsequently adopted a revised proposal requiring a supermajority vote in a June revote. Publicly reported details indicate that a contingent budget would require substantial staff reductions across bargaining units. Families considering the district should follow how this situation resolves, since the outcome will shape staffing levels and program offerings going forward.
The village itself is a compact, walkable historic community built around two intersecting main roads, with a Victorian-era downtown, an active arts presence through Hubbard Hall, a food co-op, a farmers' market, and a public library. Life is car-dependent outside the village core. The area won a state downtown revitalization grant, with several funded projects, including library and co-op expansions and stream corridor work, expected to begin construction in 2026. The housing market is considerably more affordable than the New York State average, and values have been rising moderately in recent years. Rental market data was not available.
For a family drawn to a small, single-campus rural community with a historic village character and an active local arts scene, Cambridge offers a grounded setting. The academic results at the tested grade levels are generally solid, particularly in math. The fiscal picture heading into 2026-27 is the variable worth watching closely.
See more original research from School Decision →