The top reported proficiency rate is 21% in English language arts. The lowest is 19% in Math.
Original Research by School Decision on Central Primary School
Central Primary School serves the early grades in Bedford City School District, a multi-community district spanning Bedford, Bedford Heights, Oakwood, and Walton Hills in the eastern Cleveland suburbs of Cuyahoga County. The school enrolls a small body of students across pre-kindergarten through second grade, located at 799 Washington Street in Bedford.
The student body is economically challenged. A substantial majority of students qualify for free or reduced-price lunch, and the enrollment is predominantly Black, with smaller shares of Hispanic, multiracial, and white students and very few Asian and Native Hawaiian students. The district itself serves a stable, built-out suburb where housing values remain moderate for the region. In the broader Cuyahoga County context, the district is undertaking major facility investments following a substantial bond approval in 2023, with a new pre-K-through-second-grade building scheduled to open in 2027.
State assessment results for third grade show low proficiency across both math and literacy. In the most recent data available, proficiency rates in both subjects were in the low double digits, and fewer than one-fifth of tested students met the state proficiency threshold. Participation in state testing was moderate in literacy and lower in math. These results place the school in the bottom quartile relative to other schools with tested grades in Cuyahoga County districts. A parent may want to look into these results further with the school, including what instructional supports or interventions are in place for students working below grade level, what early literacy or numeracy screening happens in pre-K through second grade, and how the school identifies and supports students who may need additional help before entering third grade testing.
The new K-2 building under construction may signal the district's effort to modernize its early-grade infrastructure and learning spaces, though that project does not address the current academic performance picture. No data on special education enrollment, English learners, attendance, or discipline were available. The school's staff size, professional development focus, or specific programs serving the early grades were also not provided, so a parent might ask the school directly about staffing, literacy and math curricula, and how the school approaches the transition from pre-K learning to formal academic instruction in kindergarten and grade one.
See more original research from School Decision →