The top reported proficiency rate is 29% in Science. The lowest is 14% in Math.
Original Research by School Decision on John B. Stanton School
John B. Stanton School is a regular public elementary school in Norwich, Connecticut, serving kindergarten through fifth grade. The school sits on a small-city campus where the Yantic, Shetucket, and Thames rivers converge, in a community actively reshaping its school facilities and downtown.
The school's enrollment of about 384 students reflects Norwich's demographic profile: roughly three-quarters of the enrollment qualifies for free or reduced-price lunch, and the student body is ethnically diverse, with significant populations of Hispanic, Black, and White students, along with smaller numbers of Asian and multiracial students. Data on English learners and students receiving special education services was not available, so families may want to ask the school directly about those supports and how the school serves students with varied language backgrounds and learning needs.
State testing results show that Stanton faces a real academic challenge. In math across grades three through five, proficiency rates ranged from low teenage percentages to under a quarter of students at the highest grade. English language arts results were similarly low in third and fourth grade, though fifth grade showed a meaningful jump to roughly a third of students meeting the standard. Science proficiency in fifth grade was also in the low thirties. When all grades and subjects are averaged together across the school, Stanton's overall proficiency index falls well below the median among districts across Southeastern Connecticut, landing in the bottom quartile of its county peer group. These are the kind of results that warrant a direct conversation with school leadership about what support gaps exist, what the school is doing to address them, and what families can expect for their child's academic pathway.
Norwich itself is a small city undergoing substantial change. Downtown holds genuine walkability around historic squares and the waterfront, but the city overall is car-dependent. The housing market is moderately priced relative to the state benchmark and is growing, with major new residential construction slated for downtown completion through 2027. The economy is anchored by healthcare, education, and government work, alongside the regional casino at nearby Mohegan Sun. Civic life centers on the downtown library, parks, and transit through the Norwich Transportation Center, which connects to regional Amtrak and commuter rail.
The school itself sits at a pivotal moment. The Norwich School District approved a major construction referendum in 2022 to replace and consolidate its elementary schools. Stanton, along with other new elementary buildings, is moving into construction in 2025 and will be built on the current school's grounds while the existing building stays open. Once the new facility is complete mid-decade, the old building will be demolished to make way for playgrounds and athletic fields. This multi-year construction phase means families enrolling now should expect ongoing building activity but also know that a substantially newer facility is coming. Additionally, the district has proposed elementary redistricting to take effect in 2027-2028 tied to the school consolidation; prospective families should check whether their address will remain in Stanton's zone or be reassigned to a different school.
For a family considering Stanton, the clearest reality is that the school is currently serving a student population with substantial academic needs and showing proficiency levels well below regional averages. The newer building and facilities coming online should be a welcome change, but the school's core instructional effectiveness is the more urgent question to explore with school leaders directly. The city and district context is one of active investment and growth, which can signal opportunity, though families should ask what specific supports and instructional strategies Stanton is deploying to raise student achievement in the intervening years before the new building opens.
See more original research from School Decision →