The top reported proficiency rate is 51% in Science. The lowest is 22% in Math.
Original Research by School Decision on Belvidere Central Middle School
Belvidere Central Middle School serves sixth through eighth grade in a consolidated, regular public setting in Boone County, Illinois. The school draws from a mixed industrial and residential community where a major employer, the Stellantis assembly plant, was idled in early 2023 but is scheduled to reopen in 2027, creating economic uncertainty and momentum within the same span of time.
The school enrolls students across a meaningful demographic range. Enrollment is distributed across the three grades, with roughly equal numbers in each. The student body includes a substantial Hispanic population, alongside a majority White population, with smaller populations of Black students, multiracial students, and other groups. Free-or-reduced-price lunch data were not available, and similarly, the count of students receiving special education or English learner services was not provided, so a complete economic and language picture would require checking directly with the school.
On state assessments, the school's proficiency picture is mixed and worth understanding in detail. In English language arts, sixth-grade performance is notably stronger, while seventh and eighth grades show lower proficiency, though students in eighth grade show a slight uptick. Math performance is consistently low across grades six, seven, and eight. In science, eighth-grade proficiency exceeds other subjects the school measures, falling slightly above the midpoint. Participation rates across tested grades are strong, consistently above 98 percent. A parent may want to look into further with the school what support structures are in place in math, where proficiency remains a soft spot, and what accounts for the stronger ELA and science results.
Compared to other districts in Boone County, the school's overall proficiency index sits above the midpoint, positioning it between the lowest and highest performers in the county. This context matters: the school is not an outlier within its immediate peer set, though there is room for growth in absolute terms.
The broader district context includes recent structural changes. Perry Elementary School is closing at the end of the 2025-26 school year after more than a century of operation, with students being redistributed by lottery. In addition, the district implemented a new cell phone policy at the start of the 2025-26 school year requiring middle school students to keep devices in lockers during the day, with limited use before/after school and at lunch. Both changes reflect district-level decisions that will shape the environment students encounter.
The community itself is in transition. Belvidere has a historic downtown anchored by civic and cultural institutions including the Ida Public Library, parks managed by the Belvidere Park District, and the Frank Lloyd Wright–designed Pettit Memorial Chapel. The city experienced a construction boom followed by stalled subdivisions, though new home building has resumed in outlying areas. Housing affordability is reasonable by national standards, and the October 2025 announcement of the plant's reopening has shifted the economic outlook considerably. A parent evaluating this school would do well to visit, ask about math support and tutoring, and understand how the ongoing district consolidation may affect long-term facilities and programs.
See more original research from School Decision →